Our Business
Environmental Energy

As at 30 June 2019, the Group had 106 waste-to-energy projects (including 2 operations and maintenance projects), 13 food waste treatment projects, 2 landfill leachate treatment projects, 2 methane-to-energy projects, 3 sludge treatment and disposal projects, 1 fecal treatment project and 1 fly ash landfill project, with a total investment of approximately RMB58.209 billion. These projects have a total designed annual household waste processing capacity of approximately 36.21 million tonnes, which can generate annual on-grid electricity of approximately 11.7 billion kWh. The total designed annual sludge treatment capacity is approximately 73,000 tonnes, and the total designed annual food waste treatment capacity is approximately 695,000 tonnes.

Projects in Operation

Project Daily Processing Capacity
(tonne)
Total Investment
(RMB Million)
Jiangsu Province
Suqian Food Waste Treatment Project Phase I 100 79
Wujiang Food Waste Treatment Project 200 141
Shandong Province
Laiwu Food Waste Treatment Project 100 50
Hainan Province
Sanya Food Waste Treatment Project Phase I and Upgrading 100 37
Zhejiang Province
Haiyan Food Waste Treatment Project Phase I 75 65
Anhui Province
Ma'anshan Food Waste Treatment Project 200 150

Suqian Food Waste Treatment Project Phase I has a designed daily food waste treatment capacity of 100 tonnes. It is the first demonstration food waste project designed, manufactured, constructed and operated by Everbright International. It has the complete processing chain and operates in synergy with the company's waste-to-energy project in the city.

Laiwu Food Waste Treatment Project has a designed daily food waste processing capacity of 100 tonnes. It was designed, constructed and operated to coordinate with Laiwu Waste-to-energy Project. It is Everbright International's first household waste and food waste co-processing project, which has led to higher processing efficiency and lower operating costs.

Sanya Food Waste Treatment Project Phase I and Upgrading has a designed daily food waste processing capacity of 100 tonnes. The project is located adjacent to Sanya Waste-to-energy Project, which creates a synergy to improve the overall project revenues.

Projects in Construction

Project Daily Processing Capacity
(tonne)
Total Investment
(RMB Million)
Jiangsu Province
Suqian Food Waste Treatment Project
Phase II
100 41.2
Liaoning Province
Daxin Food Waste Treatment Project 400 115
Henan Province
Ruzhou Food Waste Treatment Project
Phase I
50 30
Tianjin
Beichen Food Waste Treatment Project 200 110

籌建項目